Project  Description    :  Empower’s  TP-03 & TP-04 District Cooling Network line that stretches upto 2 Kms. In this project diameter of the CS pipes used varies from 2 inches to 36 inches .
Scope of Work    :  Fabrication, welding  laying and insulation of the CS chilled water pipes. Non-distructive test (NDT) and hydro test was also part of our scope of work.


  • Client: EMPOWER
  • catagory: DISTRICT COOLING
  • Main Contractor M/s Wade Adam Contratcting LLC
  • Sub Contractor M/s AGV Technical Services LLC
  • location: Bussiness Bay, Dubai, United Arab Emirates.